Three Depths of Load Testing in CI/CD

Every merge

Smoke load test

Low load on key endpoints. Thresholds fail the build.

Low load, a few minutes
Nightly or weekly

Average load test

Stable environment. Results stored to spot trends.

Typical daily load
Before a major release

Full peak load test

The full plan, plus a soak test when needed.

Peak load, an hour or more