Why Selenium teams hit a ceiling
Ordered by how often teams raise them with us, not by severity.
01
Framework maintenance
Locators drift, and someone fixes them by hand before every run.
02
Coding barrier
Selenium needs code, so most of the team cannot contribute.
03
Limited coverage
Nothing links tests to requirements, so gaps surface in production.
04
Execution time
Regression measured in hours does not fit a release measured in hours.
05
Flaky environments
A slow environment looks exactly like a real defect.